Forster 250kW Axial Flow Hydropower Project Successfully Installed in the Balkans

In March this year, the 250kW kaplan turbine generator designed and manufactured by Forster, Which was installed under the guidance of Forster engineers and is running well.

    00EA2
The project parameters are as follows:
Design                                                 head 4.7m
Design flow                                         6.63m³/s
Rated installed capacity                      250kW
Turbine model                                     ZDK283-LM
Generator model                                 SF-W250
Unit flow                                              1.56 m³/s
Generator rated efficiency                   92%
Unit speed                                           161.5 r/min
Generator rated frequency                  50Hz
Generator rated voltage                      400V
Rated speed                                        250r/min
Generator rated current                       451A
Turbine model efficiency                      90 %
Excitation method                                Brushless excitation
Maximum runaway speed                    479 r/min
Connection Methods                            Direct connection
Rated output                                         262 kW
Maximum runaway speed                    500r/min
Rated flow                                             6.63m³/s
Rated speed                                         250r/min
Turbine true machine efficiency            87%
Unit support form                                  Vertical

255165000
The customer who customized this 250kW kaplan turbine is a gentleman from the Balkans, an industrialist who has been engaged in the hydropower industry for more than 20 years.
Due to the customer’s previous successful cooperation with Forster, the customer’s project directly signed a full set of 250kW hydropower equipment procurement contracts with us after passing the environmental assessment, including generators, turbines, microcomputer speed regulators, transformers, 5 in 1 integrated control systems, etc.

00214
In the fall of 2023, the customer completed the feasibility study and environmental approval of the hydropower project, and then started the construction of the dam and machine room of the 250kW hydropower project.

3300c

The development of a 250 kW axial flow hydropower station represents a promising opportunity for harnessing renewable energy. With careful planning, stakeholder engagement, and a focus on sustainability, this project can contribute to local energy needs while minimizing environmental impact. As the world continues to seek sustainable solutions, hydropower remains a vital component of the clean energy landscape.


Post time: May-16-2024

Leave Your Message:

Send your message to us: