Shigarwa da ƙaddamarwa na Kazakhstan 3 × 8600kw Kaplan turbin injin tururi an kammala

An kammala shigarwa da ƙaddamar da injin turbin Kaplan 3 × 8600kw Kazakhstan.

kaplan turbine  kaplan water turbine

1.Flow rate: 195 m³/sec?
2. Kan ruwa: 16m
3. Wutar lantarki: 25.8MW
4.Yawaita: 50HZ
5. Wutar lantarki: 6.3KV
6. A kan grid
7. Waje babban ƙarfin lantarki: 110KV
8. Tsawo: 685 m

hydro power plant

Bayan haka, muna tsara aikin injin turbin na 2 × 5MW na gaba don masu saka hannun jari.

Godiya ga abokan ciniki saboda amanarsu ga FORSTER HYDRO.A matsayin mai ƙera kayan aikin wutar lantarki, za mu ci gaba da ƙirƙirar ƙima ga abokan cinikinmu.


Lokacin aikawa: Juni-05-2021