Fa'atuina o le Poloketi 850kw Hydropower Project i Albania

E ofoofogia lenei mea.E te manatua la matou poloketi 850KW i Albania i le masina talu ai?

Ua faʻapipiʻiina le matou uo faʻatau, e foliga mai ua sili atu lona fiafia, o le taimi muamua lea e lafo mai ai ata.

Francisturbine: 1*850KW

Lisi eletise: HLA708

Galue:SFWE-W850-6/1180

Kovana: GYWT-600-16

Valve: Z941H-2.5C DN600

Installation of the 850kw hydropower project in Albania Installation of the 850kw hydropower project in Albania2

Talu ai o matou tagata fa'atau Albania o latou lava e gaosia le fa'atonutonuina ma le puipuiga o faiga movaimananofoaga, matou te tuuina atu i latou i le turbine, generator, valve, transformer ma le kovana i lenei taimi.Ma o matou tagata faʻatau e matua faʻapitoa.E iai a latou lava au inisinia mo le inisinia, faʻapipiʻi ma faʻatonuina.E maualuga tele le lelei o galuega.

Installation of the 850kw hydropower project in Albania3 Installation of the 850kw hydropower project in Albania4


Taimi meli: Mati-12-2019

Auina mai lau savali ia i matou:

Tusi lau savali iinei ma lafo mai ia i matou