Small 1KW 3KW 5KW Micro Hydro Fixed Blade Kaplan Turbine Generator for Home
Kaplan turbine and axial flow turbine generator unit is widely used for low water head such as small river, small dam, etc. The mini axial turbine generator is made by generator and Impeller coaxial. Working principle and installation method: Choose suitable installation place ( riverside, rocky place of downstream river),use concrete and stone to build water channels; use wood to make a water gate; use barbed wire to make filter; use concrete and stone to make spiral case; build trumpet-style draft tube under the spiral case; the draft tube should be covered and under water 20-50m. The length of draft tube is the water head. The mini axial turbine generator is suitable for water head 1-12m.
Deliver Goods
The Kaplan Turbine ordered by a Chilean customer has been produced.
The equipment was ordered at the beginning of 2019, because the customer’s engineering company will have other more powerful hydropower projects in the future, so this time he and her wife went to China together to visit our factory, and gave us feedback on the upcoming delivery. Kaplan Turbine equipment is full of praise.
Overall Effect
The overall color is peacock blue,This is the flagship color of our company and the color our customers like very much.
Turbine Generator
The generator adopts a vertically installed brushless excitation synchronous generator
Packing Fixed
The packaging of our turbines is fixed with a steel frame inside and wrapped with waterproof material, and the outside is wrapped with a fumigation template.
Product Advantages
1. Comprehensive processing capacity. Such as 5M CNC VTL OPERATOR, 130 & 150 CNC floor boring machines, constant temperature annealing furnace, planer milling machine, CNC machining center ect.
2.Designed lifespan is more than 40 years.
3. Forster provide one time free site service,if the customer purchases three units (capacity ≥100kw) within one year, or the total amount is more than 5 units. Site service included equipments inspection, new site checking, installation and maintainance training ect,.
4. OEM accepted.
5.CNC machining , dynamic balance tested and isothermal annealing processed,NDT test.
6.Design and R&D Capabilities,13 senior engineers with experienced in design and research.
7.The technical consultant from Forster worked on the hydro turbine filed for 50 years and awarded the Chinese State Council Special Allowance.
55KW Kaplan Turbine Video